%0 Dataset %T Data set of daily discharge of Yulong Snow Mountain Glacier basin from 2012 to 2014 %J National Cryosphere Desert Data Center %I National Cryosphere Desert Data Center(www.ncdc.ac.cn) %U http://www.ncdc.ac.cn/portal/metadata/6b420dff-e69f-4a34-b305-d571cf35dc1b %W NCDC %R 10.12072/ncdc.CCI.db0015.2020 %A Feiteng Wang %K cross-section flow %X The conventional hydrological observation of Yulong station is carried out at Geji River (escalator artificial section is adopted due to small flow), Sanshu River (escalator artificial section is adopted due to small flow) and Baishui River (bridge section). The basin area controlled by the hydrological section of Baishui River is 29.38 km2, and the glacier area in the basin is 3.41 km2; the drainage area controlled by the hydrological section of sanshuhe river is 28.69 km2, and the glacier area in the basin is 0.60 km2; the watershed area controlled by the hydrological section of the Geji River is 18.46 km2.