{
    "created": "2026-05-19 14:51:05",
    "updated": "2026-06-11 15:00:37",
    "id": "258af5d6-ad5c-4ac5-8e33-29e8f73f3b0e",
    "version": 5,
    "ds_topic": null,
    "title_cn": "泄水闸门前淤堵物快速清理装备隔河岩水电站现场功能测试记录数据（2025年）",
    "title_en": "Sluice gate front clogging rapid cleaning equipment laboratory test record data(2025)",
    "ds_abstract": "<p>&emsp;&emsp;泄水闸门前淤堵物快速清理装备隔河岩水电站现场功能测试记录数据包括装备测试部位水深等测试数据，装备测试地点为隔河岩水电站坝前。作业深度数据通过深度传感器测得，其余数据通过ROV观测记录。</p>",
    "ds_source": "<p>&emsp;&emsp;数据来源于泄水闸门前淤堵物快速清理装备在隔河岩水电站水下的开展行走、破碎、抓取、绞吸等测试。</p>",
    "ds_process_way": "<p>&emsp;&emsp;（1）作业深度数据通过深度传感器记录的数据读取；</p>\n<p>&emsp;&emsp;（2）行走、破碎、抓取、绞吸等测试未记录数据，通过ROV观察装备是否具备功能。</p>",
    "ds_quality": "<p>&emsp;&emsp;数据均为通过校准的仪器设备测量所得，精度满足第三方机构检测的要求，经多次重复测量与均值处理，所有流程均记录归档，支持结果可追溯与可复现。</p>",
    "ds_acq_start_time": "2025-01-01 00:00:00",
    "ds_acq_end_time": null,
    "ds_acq_place": "中国",
    "ds_acq_lon_east": null,
    "ds_acq_lat_south": null,
    "ds_acq_lon_west": null,
    "ds_acq_lat_north": null,
    "ds_acq_alt_low": null,
    "ds_acq_alt_high": null,
    "ds_share_type": "login-access",
    "ds_total_size": 117069,
    "ds_files_count": 0,
    "ds_format": "*.pdf,*.docx",
    "ds_space_res": "",
    "ds_time_res": "日",
    "ds_coordinate": "无",
    "ds_projection": "",
    "ds_thumbnail": "258af5d6-ad5c-4ac5-8e33-29e8f73f3b0e.png",
    "ds_thumb_from": 2,
    "ds_ref_way": "",
    "paper_ref_way": "",
    "ds_ref_instruction": "",
    "ds_from_station": "",
    "organization_id": "c0a03a3b-e859-4f8b-8abe-a6a23a81aedb",
    "ds_serv_man": "李星",
    "ds_serv_phone": "13247168556",
    "ds_serv_mail": "lixing3@cjwsjy.com.cn",
    "doi_value": "",
    "subject_codes": [
        "410"
    ],
    "quality_level": 0,
    "publish_time": "2026-06-11 18:34:56",
    "last_updated": "2026-06-11 18:34:56",
    "protected": false,
    "protected_to": null,
    "lang": "zh",
    "cstr": "",
    "i18n": {
        "en": {
            "title": "Sluice gate front clogging rapid cleaning equipment laboratory test record data(2025)",
            "ds_format": "*.pdf,*.docx",
            "ds_source": "<p>&emsp; &emsp; The data comes from the rapid cleaning equipment for blockages in front of the spillway gate, which conducted tests such as walking, crushing, grabbing, and twisting suction underwater at the Geheyan Hydropower Station. </p>",
            "ds_quality": "<p>&emsp; &emsp; The data is measured by calibrated instruments and equipment, and the accuracy meets the requirements of third-party organization testing. After multiple repeated measurements and mean processing, all processes are recorded and archived, and the results are traceable and reproducible. </p>",
            "ds_ref_way": "",
            "ds_abstract": "<p>&emsp; &emsp; The equipment for rapid cleaning of blockages in front of the spillway gate is located in front of the dam of Geheyan Hydropower Station. The on-site functional test record data includes water depth and other test data of the equipment testing site. The depth data of the homework is measured by a depth sensor, and the remaining data is recorded through ROV observation. </p>",
            "ds_time_res": "",
            "ds_acq_place": "China",
            "ds_space_res": "",
            "ds_projection": "",
            "ds_process_way": "<p>&emsp; &emsp; (1) The homework depth data is read from the data recorded by the depth sensor; </p>",
            "ds_ref_instruction": ""
        }
    },
    "submit_center_id": "ncdc",
    "data_level": 0,
    "recommendation_value": 0,
    "license_type": "https://creativecommons.org/licenses/by/4.0/",
    "doi_reg_from": "reg_local",
    "cstr_reg_from": "reg_local",
    "doi_not_reg_reason": null,
    "cstr_not_reg_reason": null,
    "is_paper_in_submitting": false,
    "belong_to_nieer": false,
    "ds_topic_tags": [
        "库坝系统",
        "装备",
        "功能测试"
    ],
    "ds_subject_tags": [
        "工程与技术科学基础学科"
    ],
    "ds_class_tags": [],
    "ds_locus_tags": [
        "中国"
    ],
    "ds_time_tags": [
        2025
    ],
    "ds_contributors": [
        {
            "true_name": "田金章",
            "email": "tianjinzhang@cjwsjy.com.cn",
            "work_for": "长江勘测规划设计研究有限责任公司",
            "country": "中国"
        }
    ],
    "ds_meta_authors": [
        {
            "true_name": "田金章",
            "email": "tianjinzhang@cjwsjy.com.cn",
            "work_for": "长江勘测规划设计研究有限责任公司",
            "country": "中国"
        }
    ],
    "ds_managers": [
        {
            "true_name": "李星",
            "email": "lixing3@cjwsjy.com.cn",
            "work_for": "长江勘测规划设计研究有限责任公司",
            "country": "中国"
        }
    ],
    "category": "其他"
}