{
    "created": "2018-11-15 06:02:45",
    "updated": "2026-04-29 03:48:18",
    "id": "46d65588-df11-407c-9df7-bd9190ab95d9",
    "version": 2,
    "ds_topic": "a9243521-7a33-4a8a-a235-288c1f4bc8b8",
    "title_cn": "2017-2020年黄土丘陵沟壑区第一副区辛店沟流域坝库淤积观测数据集",
    "title_en": "Observation data set of dam and reservoir siltation in xindiangou watershed, the first sub district of Loess Hilly and Gully Area",
    "ds_abstract": "<p>本数据集为2017-2020年黄土丘陵沟壑区第一副区辛店沟流域坝库（3座淤地坝）淤积观测数据集。调查方法主要为基于三维坐标控制桩和水尺监测桩，采用常规监测和RTK两种方法。调查内容包括淤地坝的平均淤积厚度及淤积量。数据包括淤地坝监测点图、淤积观测数据计算成果表。</p>",
    "ds_source": "<p>人工调查                   </p>",
    "ds_process_way": "<p>次暴雨或年、汛期后，对选定的监测淤地坝所在地进行实地监测，利用各监测站点监测桩上的水尺读数或泥沙淤积实时监测高程，读取次暴雨后监测淤地坝的各个监测站点上的淤积高程，然后采用平均淤积高程法，计算出所监测淤地坝的泥沙淤积量。</p>",
    "ds_quality": "<p>调查数据分别经过调查、计算和报告编写，以确保数据质量。                        </p>",
    "ds_acq_start_time": "2017-01-01 00:00:00",
    "ds_acq_end_time": "2020-12-31 00:00:00",
    "ds_acq_place": "陕西省榆林市绥德县辛店沟流域",
    "ds_acq_lon_east": 110.29666666666667,
    "ds_acq_lat_south": 37.49472222222222,
    "ds_acq_lon_west": 110.2775,
    "ds_acq_lat_north": 37.516666666666666,
    "ds_acq_alt_low": 840.0,
    "ds_acq_alt_high": 1040.0,
    "ds_share_type": "apply-access",
    "ds_total_size": 3086995,
    "ds_files_count": 8,
    "ds_format": "Excel表格",
    "ds_space_res": null,
    "ds_time_res": "次",
    "ds_coordinate": "WGS84",
    "ds_projection": "",
    "ds_thumbnail": "46d65588-df11-407c-9df7-bd9190ab95d9.jpg",
    "ds_thumb_from": 2,
    "ds_ref_way": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站），2017-2018年黄土丘陵沟壑区第一副区辛店沟流域坝库淤积观测数据集，国家冰川冻土沙漠科学数据中心(www.ncdc.ac.cn)，2018，doi：10.12072/ncdc.HWSDZhan.db0036.2020",
    "paper_ref_way": "",
    "ds_ref_instruction": "",
    "ds_from_station": null,
    "organization_id": "f447b2e7-0b54-4601-8d49-0164f2a3fd9a",
    "ds_serv_man": "敏玉芳",
    "ds_serv_phone": "093149675976",
    "ds_serv_mail": "myf@lzb.ac.cn",
    "doi_value": "",
    "subject_codes": [],
    "quality_level": 3,
    "publish_time": "2022-02-21 21:33:44",
    "last_updated": "2023-05-16 17:34:46",
    "protected": false,
    "protected_to": null,
    "lang": "zh",
    "cstr": "11738.11.ncdc.HWSDZhan.2020.66",
    "i18n": {
        "en": {
            "title": "Observation data set of dam and reservoir siltation in xindiangou watershed, the first sub district of Loess Hilly and Gully Area",
            "ds_format": "",
            "ds_source": "<pre><code>\n</code></pre>\n<p>Manual investigation</p>",
            "ds_quality": "<pre><code>                         &lt;p&gt;Survey data are investigated, calculated and reported to ensure data quality. &lt;/p&gt;\n</code></pre>",
            "ds_ref_way": "                        ",
            "ds_abstract": "<pre><code>\n</code></pre>\n<p>This data set is the sedimentation observation data set of dam and reservoir (three warping dams) in xindiangou watershed of the first sub region of Loess Hilly and gully region from 2017 to 2020. The survey methods are mainly based on three-dimensional coordinate control pile and water gauge monitoring pile, using conventional monitoring and RTK methods. The survey includes the average thickness and amount of silting. The data include warping dam monitoring point map and siltation observation data calculation results table. </p>",
            "ds_time_res": "次",
            "ds_acq_place": "Xindiangou watershed, Suide County, Yulin City, Shaanxi Province",
            "ds_space_res": "",
            "ds_projection": "",
            "ds_process_way": "<pre><code>                     &lt;p&gt;After the rainstorm or annual and flood season, the selected monitoring warping dam site shall be monitored on the spot. The water gauge reading on each monitoring station or the real-time monitoring elevation of sediment deposition shall be used to read the water surface elevation on each monitoring station of the warping dam after the rainstorm, and then the average deposition elevation method shall be used to calculate the sediment deposition amount of the monitored warping dam. &lt;/p&gt;\n</code></pre>",
            "ds_ref_instruction": "                                                                                                                        \r\n"
        }
    },
    "submit_center_id": "ncdc",
    "data_level": 0,
    "license_type": "CC BY 4.0",
    "doi_reg_from": "reg_local",
    "cstr_reg_from": "reg_local",
    "doi_not_reg_reason": null,
    "cstr_not_reg_reason": null,
    "is_paper_in_submitting": false,
    "ds_topic_tags": [
        "坝库淤积",
        "泥沙淤积",
        "淤积高程",
        "泥沙淤积量"
    ],
    "ds_subject_tags": [],
    "ds_class_tags": [],
    "ds_locus_tags": [
        "辛店沟",
        "绥德",
        "榆林",
        "陕西省"
    ],
    "ds_time_tags": [
        2017,
        2018,
        2019,
        2020
    ],
    "ds_contributors": [
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_meta_authors": [
        {
            "true_name": "雷欣",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_managers": [
        {
            "true_name": "郭玉梅",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        },
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "category": "水土保持"
}