    "created": "2019-10-09 10:35:19",
    "updated": "2026-04-17 06:46:56",
    "id": "4fce2605-08da-442e-995e-995fd6002b9a",
    "version": 2,
    "ds_topic": "a9243521-7a33-4a8a-a235-288c1f4bc8b8",
    "title_cn": "1964-1965年黄土丘陵沟壑区第一副区王茂沟流域径流、泥沙观测数据集",
    "title_en": "Observation data set of runoff and sediment in the first sub-area of Wangmaogou watershed in the loess hilly gully area from 1964 to 1965",
    "ds_abstract": "<p>本数据集为1964-1965年王茂沟流域1个径流站径流、泥沙观测数据，通过径流站测流断面水位观测，泥沙取样，计算产流时的径流、泥沙量。数据集包括径流站的测流断面图、实测流量成果表、洪水水文要素摘录表、逐次洪水测验成果表、逐日平均流量表、逐日平均含沙量表、逐日平均输沙率表。径流站情况见王茂沟流域径流站基本情况表。\n</p>",
    "ds_source": "<p>人工定时观测</p>",
    "ds_process_way": "<p>1.径流站水位观测方法为：读取测流断面测流建筑物的水尺数，非汛期每日8是观测一次，如有降雨，日水位变化缓慢时8时、20时观测两次；日水位变化较大或出现缓慢的峰谷时按2时、8时、14时、20时观测四次。汛期水位变化剧烈时按6分钟的倍数观测。\n2.王茂庄径流站的测流方式：采用已率定的经人工整理的自然断面观测，流量计算采用已率定的推流公式。\n3.泥沙取样及处理：测流断面泥沙采用中泓浮标法取样，取沙次数取决于洪水水位变化的次数，洪峰时为控制含沙量变化而增加取样次数。样品处理采用置换法。</p>",
    "ds_quality": "<p>由专业技术人员进行人工观测；数据录入过程中经过四级人工校核，分别是制表、初校、复校、审核，以确保数据质量。</p>",
    "ds_acq_start_time": "1964-01-01 00:00:00",
    "ds_acq_end_time": "1965-12-31 00:00:00",
    "ds_acq_place": "陕西省榆林市绥德县王茂沟流域",
    "ds_acq_lon_east": 110.37944444444443,
    "ds_acq_lat_south": 37.571111111111115,
    "ds_acq_lon_west": 110.34277777777777,
    "ds_acq_lat_north": 37.59444444444445,
    "ds_acq_alt_low": 2.0,
    "ds_acq_alt_high": null,
    "ds_share_type": "login-access",
    "ds_total_size": 79405,
    "ds_files_count": 3,
    "ds_format": "Excel",
    "ds_space_res": null,
    "ds_time_res": "分、日、次",
    "ds_coordinate": "WGS84",
    "ds_projection": "",
    "ds_thumbnail": "4fce2605-08da-442e-995e-995fd6002b9a.jpg",
    "ds_thumb_from": 2,
    "ds_ref_way": "",
    "paper_ref_way": "",
    "ds_ref_instruction": "",
    "ds_from_station": null,
    "organization_id": "f447b2e7-0b54-4601-8d49-0164f2a3fd9a",
    "ds_serv_man": "敏玉芳",
    "ds_serv_phone": "09314967597",
    "ds_serv_mail": "myf@lzb.ac.cn",
    "doi_value": "",
    "subject_codes": [
        "170.5525"
    ],
    "quality_level": 3,
    "publish_time": "2021-08-26 15:42:06",
    "last_updated": "2023-06-28 15:34:28",
    "protected": false,
    "protected_to": null,
    "lang": "zh",
    "cstr": "11738.11.ncdc.HWSDZhan.2021.141",
    "i18n": {
        "en": {
            "title": "Observation data set of runoff and sediment in the first sub-area of Wangmaogou watershed in the loess hilly gully area from 1964 to 1965",
            "ds_format": "Excel",
            "ds_source": "<p>Manual timing observation</p>",
            "ds_quality": "<p>Manual observation shall be conducted by professional technicians; during data entry, four levels of manual verification shall be conducted, including tabulation, primary calibration, re calibration and audit, so as to ensure data quality. </p>",
            "ds_ref_way": "",
            "ds_abstract": "<p>This data set is the observation data of runoff and sediment of a runoff station in wangmaogou watershed from 1964 to 1969. Through the observation of water level of the flow section measured by the runoff station and sediment sampling, the runoff and sediment volume at the time of runoff production are calculated. The data set includes the flow measurement section map of runoff station, the result table of measured flow, the extract table of flood hydrological elements, the result table of successive flood tests, the daily average flow table, the daily average sediment concentration table and the daily average sediment transport rate table. See the basic situation of runoff station in wangmaogou watershed for the situation of runoff station.\n</p>",
            "ds_time_res": "分、日、次",
            "ds_acq_place": "Wangmao Valley, Suide County, Yulin City, Shaanxi Province",
            "ds_space_res": "",
            "ds_projection": "",
            "ds_process_way": "<p>1. The water level observation method of runoff station is: read the water gauge number of the flow measurement building on the flow measurement section. In non flood season, 8:00 and 20:00 respectively are observed once a day. If there is rainfall, observe twice at 8:00 and 20:00 respectively when the daily water level changes slowly; observe four times at 2:00, 8:00, 14:00 and 20:00 respectively when the daily water level changes greatly or there are slow peaks and valleys. During the flood season, when the water level changes violently, it shall be observed in multiple of 6 minutes.\n2. Flow measurement method of wangmaozhuang runoff station: adopt the calibrated natural section observation and the calibrated push flow formula for flow calculation.\n3. Sediment sampling and treatment: the sediment in the flow measurement section is sampled by the thalweg buoy method, and the number of sediment sampling depends on the number of changes in the flood water level. In order to control the change of sediment concentration, the number of sampling is increased during the flood peak. The sample was treated by displacement method. </p>",
            "ds_ref_instruction": ""
        }
    },
    "submit_center_id": "ncdc",
    "data_level": 0,
    "license_type": "CC BY 4.0",
    "ds_topic_tags": [
        "径流量",
        "含沙量",
        "输沙率",
        "径流系数",
        "径流模数",
        "土壤流失量",
        "水位",
        "侵蚀模数",
        "径流深度",
        "流量"
    ],
    "ds_subject_tags": [
        "水文气象学"
    ],
    "ds_class_tags": [],
    "ds_locus_tags": [
        "榆林",
        "绥德",
        "王茂沟",
        "陕西省"
    ],
    "ds_time_tags": [
        1964,
        1965
    ],
    "ds_contributors": [
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_meta_authors": [
        {
            "true_name": "雷欣",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_managers": [
        {
            "true_name": "郭玉梅",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        },
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "category": "水土保持"
}