{
    "created": "2022-11-23 11:26:35",
    "updated": "2026-04-27 21:30:32",
    "id": "504d7fd2-7a59-4848-a6bc-5d821728eb3c",
    "version": 10,
    "ds_topic": null,
    "title_cn": "基槽泥沙淤积预报数据集（2020年6月-2021年4月）",
    "title_en": "Prediction dataset for sedimentation in foundation trenches (June 2020 April 2021)",
    "ds_abstract": "<p>&emsp;&emsp;基槽泥沙淤积预报主要面向深中通道工程需求建设，基于数值模拟预报系统产生，主要列出了E1-E9共计9个管节沉放施工期间给出了基槽泥沙回淤厚度预报值。预报为沉管施工的决策以及施工组织提供了重要的支撑。从实际结果看，通过预报值准确给出了是否满足设计要求的判断，为施工提供了准确的依据。\n<p>&emsp;&emsp;数据时间范围为2020年6月至2021年4月件E1-E9管节沉放施工期间泥沙回淤预报数据，每次预报根据施工组织安排，预报碎石整平开始至沉管沉放施工完成之间的每日及累计泥沙淤积厚度。",
    "ds_source": "<p>&emsp;&emsp;基于数值模拟预报系统产生。",
    "ds_process_way": "<p>&emsp;&emsp;计算模拟。",
    "ds_quality": "<p>&emsp;&emsp;数据质量良好。",
    "ds_acq_start_time": "2020-06-01 00:00:00",
    "ds_acq_end_time": "2021-04-30 00:00:00",
    "ds_acq_place": "",
    "ds_acq_lon_east": null,
    "ds_acq_lat_south": null,
    "ds_acq_lon_west": null,
    "ds_acq_lat_north": null,
    "ds_acq_alt_low": null,
    "ds_acq_alt_high": null,
    "ds_share_type": "login-access",
    "ds_total_size": 830800,
    "ds_files_count": 3,
    "ds_format": "pdf",
    "ds_space_res": null,
    "ds_time_res": "日",
    "ds_coordinate": "无",
    "ds_projection": "",
    "ds_thumbnail": "504d7fd2-7a59-4848-a6bc-5d821728eb3c.png",
    "ds_thumb_from": 2,
    "ds_ref_way": "",
    "paper_ref_way": "",
    "ds_ref_instruction": "",
    "ds_from_station": null,
    "organization_id": "57a5e5a3-6fc5-43b5-a2ba-1f2ca54b7727",
    "ds_serv_man": "敏玉芳",
    "ds_serv_phone": "0931-4967596",
    "ds_serv_mail": "ncdc@lzb.ac.cn",
    "doi_value": "",
    "subject_codes": [
        "170.45"
    ],
    "quality_level": 3,
    "publish_time": "2023-06-09 09:15:25",
    "last_updated": "2025-06-30 14:52:36",
    "protected": false,
    "protected_to": null,
    "lang": "zh",
    "cstr": "11738.11.NCDC.NIEER.DB2810.2023",
    "i18n": {
        "en": {
            "title": "Prediction dataset for sedimentation in foundation trenches (June 2020 April 2021)",
            "ds_format": "pdf",
            "ds_source": "<p>&emsp; &emsp; Generated based on numerical simulation forecasting system.",
            "ds_quality": "<p>&emsp; &emsp; The data quality is good.",
            "ds_ref_way": "",
            "ds_abstract": "<p>    The prediction of sediment deposition in the foundation trench is mainly aimed at the construction needs of deep and medium channel engineering. Based on the numerical simulation prediction system, it mainly lists the predicted thickness of sediment deposition in the foundation trench during the sinking construction period of 9 pipe sections E1-E9. The forecast provides important support for the decision-making and construction organization of immersed tube construction. From the actual results, it can be seen that the predicted values accurately provide a judgment on whether the design requirements are met, providing accurate basis for construction.\n<p>    The data time range is from June 2020 to April 2021, during the sedimentation construction period of E1-E9 pipe sections. Each forecast is based on the construction organization arrangement, predicting the daily and cumulative sediment deposition thickness between the start of gravel leveling and the completion of sinking construction.</p></p>",
            "ds_time_res": "日",
            "ds_acq_place": "",
            "ds_space_res": "",
            "ds_projection": "",
            "ds_process_way": "<p>&emsp; &emsp; Computational simulation.",
            "ds_ref_instruction": ""
        }
    },
    "submit_center_id": "ncdc",
    "data_level": 0,
    "license_type": "CC BY 4.0",
    "doi_reg_from": "reg_local",
    "cstr_reg_from": "reg_local",
    "doi_not_reg_reason": null,
    "cstr_not_reg_reason": null,
    "ds_topic_tags": [
        "深中通道",
        "施工期",
        "海底隧道基槽",
        "泥沙淤积",
        "预报"
    ],
    "ds_subject_tags": [
        "地理学"
    ],
    "ds_class_tags": [],
    "ds_locus_tags": [],
    "ds_time_tags": [
        2020,
        2021
    ],
    "ds_contributors": [
        {
            "true_name": "管维东",
            "email": "780382843@qq.com",
            "work_for": "中交公路长大桥建设国家工程研究中心有限公司",
            "country": "中国"
        }
    ],
    "ds_meta_authors": [
        {
            "true_name": "管维东",
            "email": "780382843@qq.com",
            "work_for": "中交公路长大桥建设国家工程研究中心有限公司",
            "country": "中国"
        }
    ],
    "ds_managers": [
        {
            "true_name": "管维东",
            "email": "780382843@qq.com",
            "work_for": "中交公路长大桥建设国家工程研究中心有限公司",
            "country": "中国"
        }
    ],
    "category": "其他"
}