{
    "created": "2020-11-12 02:02:24",
    "updated": "2026-05-06 06:27:22",
    "id": "c2d68b75-5b2b-4b87-8289-c4bf73774651",
    "version": null,
    "ds_topic": null,
    "title_cn": "1980-1990年黄土丘陵沟壑区第一副区辛店沟流域径流、泥沙观测数据集",
    "title_en": "Observation data of runoff and sediment in the first loess hilly gully region from 1980 to 1990",
    "ds_abstract": "<p>本数据集为1980-1990年辛店沟流域径流、泥沙观测数据集。辛店沟流域位于陕西省榆林市绥德县，属于无定河一级支流。辛店沟流域布设有1个径流站，通过径流站测流断面水位观测，泥沙取样，计算产流时的径流、泥沙量。数据包括辛店沟流域站点分布图、径流站测流断面图、洪水水文要素摘录表、逐次洪水测验成果表。径流站情况见《辛店沟流域1980-1990年情况说明》。</p>",
    "ds_source": "<p>人工定时观测</p>",
    "ds_process_way": "<p>1.水位观测：辛店沟径流站利用建筑物侧壁上的水尺进行水位测定，非汛期每日8时观测一次，如有降雨，日水位变化缓慢时8时、20时观测两次；日水位变化较大或出现缓慢的峰谷时按2时、8时、14时、20时观测四次。汛期水位变化剧烈时按6分钟的倍数观测。 2.测流方式：平水时采用三角槽测流；水位高于三角槽时，在矩形溢洪道采用浮标法测流，浮标系数采用黄委子洲径流试验站浮标试验结果。 3.泥沙取样及处理：测流断面泥沙采用中泓浮标法取样，取沙次数取决于洪水水位变化的次数，洪峰时为控制含沙量变化而增加取样次数。样品处理采用置换法。</p>",
    "ds_quality": "<p>由专业技术人员进行人工观测；数据录入过程中经过四级人工校核，分别是制表、初校、复校、审核，以确保数据质量。</p>",
    "ds_acq_start_time": "1980-01-01 00:00:00",
    "ds_acq_end_time": "1990-12-31 00:00:00",
    "ds_acq_place": "陕西省榆林市绥德县辛店沟流域",
    "ds_acq_lon_east": 110.29666666666667,
    "ds_acq_lat_south": 37.49472222222222,
    "ds_acq_lon_west": 110.2775,
    "ds_acq_lat_north": 37.516666666666666,
    "ds_acq_alt_low": 2.0,
    "ds_acq_alt_high": null,
    "ds_share_type": "apply-access",
    "ds_total_size": 320262,
    "ds_files_count": 5,
    "ds_format": "xls，doc，pdf",
    "ds_space_res": null,
    "ds_time_res": "分、日、次",
    "ds_coordinate": "WGS84",
    "ds_projection": "",
    "ds_thumbnail": "c2d68b75-5b2b-4b87-8289-c4bf73774651.jpg",
    "ds_thumb_from": 2,
    "ds_ref_way": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站），1980-1990年黄土丘陵沟壑区第一副区辛店沟流域径流、泥沙观测数据集，国家冰川冻土沙漠科学数据中心(www.ncdc.ac.cn)，2020，doi：10.12072/ncdc.HWSDZhan.db0053.2020",
    "paper_ref_way": "",
    "ds_ref_instruction": "",
    "ds_from_station": null,
    "organization_id": "f447b2e7-0b54-4601-8d49-0164f2a3fd9a",
    "ds_serv_man": "敏玉芳",
    "ds_serv_phone": "093149675976",
    "ds_serv_mail": "myf@lzb.ac.cn",
    "doi_value": "",
    "subject_codes": null,
    "quality_level": 3,
    "publish_time": "2020-12-07 14:51:45",
    "last_updated": "2020-12-07 14:51:45",
    "protected": false,
    "protected_to": null,
    "lang": "zh",
    "cstr": "11738.11.ncdc.HWSDZhan.2020.116",
    "i18n": {
        "en": {
            "title": "Observation data of runoff and sediment in the first loess hilly gully region from 1980 to 1990",
            "ds_format": "",
            "ds_source": "<p>Manual timing observation</p>",
            "ds_quality": "<p>Manual observation shall be conducted by professional technicians; during data entry, four levels of manual verification shall be conducted, including tabulation, primary calibration, re calibration and audit, so as to ensure data quality. </p>",
            "ds_ref_way": "",
            "ds_abstract": "<p>This data set is the runoff and sediment observation data of xindiangou watershed test site from 1980 to 1990. Through the water level observation and sediment sampling of runoff station section, the runoff and sediment amount during runoff generation are calculated. The data set includes flow section diagram of runoff station, measured discharge result table, extraction table of flood hydrological elements, successive flood test result table, daily average discharge table, daily average sediment concentration table and daily average sediment transport rate table. See the basic information table of runoff stations in xindiangou basin for the situation of runoff stations. </p>",
            "ds_time_res": "分、日、次",
            "ds_acq_place": "",
            "ds_space_res": "",
            "ds_projection": "",
            "ds_process_way": "<p>1. The water level observation method of runoff station is: read the water gauge number of the flow measurement building on the flow measurement section. In non flood season, 8:00 and 20:00 respectively are observed once a day. If there is rainfall, observe twice at 8:00 and 20:00 respectively when the daily water level changes slowly; observe four times at 2:00, 8:00, 14:00 and 20:00 respectively when the daily water level changes greatly or there are slow peaks and valleys. During the flood season, when the water level changes violently, it shall be observed in multiple of 6 minutes.\n2. Flow measurement method of runoff station in the test site: Basel measuring flume is used for flow measurement, and push flow formula is used for flow calculation.\n3. Sediment sampling and treatment: the sediment in the flow measurement section is sampled by the thalweg buoy method, and the number of sediment sampling depends on the number of changes in the flood water level. In order to control the change of sediment concentration, the number of sampling is increased during the flood peak. The sample was treated by displacement method. </p>",
            "ds_ref_instruction": "                                                                                                                        "
        }
    },
    "submit_center_id": "ncdc",
    "data_level": 0,
    "license_type": "CC BY 4.0",
    "doi_reg_from": "reg_local",
    "cstr_reg_from": "reg_local",
    "doi_not_reg_reason": null,
    "cstr_not_reg_reason": null,
    "is_paper_in_submitting": false,
    "ds_topic_tags": [
        "径流模数",
        "径流系数",
        "输沙率",
        "水位",
        "侵蚀模数",
        "流量",
        "含沙量",
        "径流深度",
        "径流量",
        "土壤流失量"
    ],
    "ds_subject_tags": [
        "水文气象学"
    ],
    "ds_class_tags": [],
    "ds_locus_tags": [
        "辛店沟",
        "榆林",
        "绥德",
        "陕西省"
    ],
    "ds_time_tags": [
        1980,
        1981,
        1982,
        1983,
        1984,
        1985,
        1986,
        1987,
        1988,
        1989,
        1990
    ],
    "ds_contributors": [
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_meta_authors": [
        {
            "true_name": "雷欣",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_managers": [
        {
            "true_name": "郭玉梅",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        },
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "category": "水土保持"
}