{
    "created": "2019-10-09 10:39:14",
    "updated": "2026-05-24 21:54:52",
    "id": "d06ea27e-1134-4fd9-a1a1-a4c7138ba716",
    "version": 2,
    "ds_topic": "a9243521-7a33-4a8a-a235-288c1f4bc8b8",
    "title_cn": "1954-1979年黄土丘陵沟壑区第一副区辛店沟流域径流、泥沙观测数据集",
    "title_en": "Observation data set of runoff and sediment in Xindiangou watershed in the first sub region of Loess Hilly and gully region from 1954 to 1979",
    "ds_abstract": "<p>本数据集为1954-1979年辛店沟流域试验场径流站径流、泥沙观测数据，通过径流站测流断面水位观测，泥沙取样，计算产流时的径流、泥沙量。数据集包括径流站的测流断面图、实测流量成果表、洪水水文要素摘录表、逐次洪水测验成果表、逐日平均流量表、逐日平均含沙量表、逐日平均输沙率表。径流站情况见辛店沟流域径流站基本情况表。</p>",
    "ds_source": "<p>人工定时观测</p>",
    "ds_process_way": "<p>1.径流站水位观测方法为：读取测流断面测流建筑物的水尺数，非汛期每日8是观测一次，如有降雨，日水位变化缓慢时8时、20时观测两次；日水位变化较大或出现缓慢的峰谷时按2时、8时、14时、20时观测四次。汛期水位变化剧烈时按6分钟的倍数观测。\n2.试验场径流站的测流方式：采用巴塞尔量水槽测流，流量计算采用推流公式。\n3.泥沙取样及处理：测流断面泥沙采用中泓浮标法取样，取沙次数取决于洪水水位变化的次数，洪峰时为控制含沙量变化而增加取样次数。样品处理采用置换法。</p>",
    "ds_quality": "<p>由专业技术人员进行人工观测；数据录入过程中经过四级人工校核，分别是制表、初校、复校、审核，以确保数据质量。</p>",
    "ds_acq_start_time": "1954-01-01 00:00:00",
    "ds_acq_end_time": "1979-12-31 00:00:00",
    "ds_acq_place": "陕西省榆林市绥德县辛店沟流域",
    "ds_acq_lon_east": 110.29666666666667,
    "ds_acq_lat_south": 37.49472222222222,
    "ds_acq_lon_west": 110.2775,
    "ds_acq_lat_north": 37.516666666666666,
    "ds_acq_alt_low": 2.0,
    "ds_acq_alt_high": null,
    "ds_share_type": "login-access",
    "ds_total_size": 249649,
    "ds_files_count": 4,
    "ds_format": "Excel",
    "ds_space_res": null,
    "ds_time_res": "分、日、次",
    "ds_coordinate": "WGS84",
    "ds_projection": "",
    "ds_thumbnail": "d06ea27e-1134-4fd9-a1a1-a4c7138ba716.jpg",
    "ds_thumb_from": 2,
    "ds_ref_way": "",
    "paper_ref_way": "",
    "ds_ref_instruction": "",
    "ds_from_station": null,
    "organization_id": "f447b2e7-0b54-4601-8d49-0164f2a3fd9a",
    "ds_serv_man": "敏玉芳",
    "ds_serv_phone": "09314967597",
    "ds_serv_mail": "myf@lzb.ac.cn",
    "doi_value": "",
    "subject_codes": [
        "170.5525"
    ],
    "quality_level": 3,
    "publish_time": "2021-08-26 15:44:29",
    "last_updated": "2023-06-28 15:29:07",
    "protected": false,
    "protected_to": null,
    "lang": "zh",
    "cstr": "11738.11.ncdc.HWSDZhan.2021.140",
    "i18n": {
        "en": {
            "title": "Observation data set of runoff and sediment in Xindiangou watershed in the first sub region of Loess Hilly and gully region from 1954 to 1979",
            "ds_format": "Excel",
            "ds_source": "<p>Artificial timing observation</p>",
            "ds_quality": "<p>Manual observation is carried out by professional and technical personnel; four levels of manual verification are carried out in the process of data input, which are tabulation, initial calibration, re calibration and audit, so as to ensure the data quality. </p>",
            "ds_ref_way": "",
            "ds_abstract": "<p>This data set is the runoff and sediment observation data of Xindiangou watershed test site from 1954 to 1979. The runoff and sediment yield are calculated by water level observation and sediment sampling at runoff station. The data set includes flow section diagram of runoff station, measured discharge result table, extraction table of flood hydrological elements, successive flood test result table, daily average discharge table, daily average sediment concentration table and daily average sediment transport rate table. See the basic information table of runoff stations in xindiangou basin for the situation of runoff stations. </p>",
            "ds_time_res": "分、日、次",
            "ds_acq_place": "Xindiangou watershed, Suide County, Yulin City, Shaanxi Province",
            "ds_space_res": "",
            "ds_projection": "",
            "ds_process_way": "<p>1. The water level observation method of runoff station is as follows: read the water gauge number of the flow measurement structure on the flow measurement section, and observe once a day at 8:00 in non flood season; observe twice at 8:00 and 20:00 when the daily water level changes slowly in case of rainfall; and observe four times at 2:00, 8:00, 14:00 and 20:00 when the daily water level changes greatly or appears slow peak and valley. When the water level changes violently in flood season, the observation shall be made in multiples of 6 minutes.\n2. The flow measurement method of runoff station in the test site: Basle flume is used to measure the flow, and the push flow formula is used for flow calculation.\n3. Sediment sampling and treatment: the midstream buoy method is used to sample the sediment at the flow measurement section. The frequency of sediment sampling depends on the frequency of flood water level change, and the sampling frequency is increased to control the change of sediment concentration at flood peak. The sample was treated by displacement method. </p>",
            "ds_ref_instruction": ""
        }
    },
    "submit_center_id": "ncdc",
    "data_level": 0,
    "recommendation_value": 0,
    "license_type": "https://creativecommons.org/licenses/by/4.0/",
    "doi_reg_from": "reg_local",
    "cstr_reg_from": "reg_local",
    "doi_not_reg_reason": null,
    "cstr_not_reg_reason": null,
    "is_paper_in_submitting": false,
    "ds_topic_tags": [
        "径流模数",
        "径流系数",
        "径流量",
        "侵蚀模数",
        "输沙率",
        "含沙量",
        "流量",
        "土壤流失量",
        "径流深度",
        "水位"
    ],
    "ds_subject_tags": [
        "水文气象学"
    ],
    "ds_class_tags": [],
    "ds_locus_tags": [
        "辛店沟",
        "榆林",
        "绥德",
        "陕西省"
    ],
    "ds_time_tags": [
        1958,
        1959,
        1960,
        1961
    ],
    "ds_contributors": [
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_meta_authors": [
        {
            "true_name": "雷欣",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        },
        {
            "true_name": "刘思君",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "ds_managers": [
        {
            "true_name": "郭玉梅",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        },
        {
            "true_name": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "email": "hhstbcsdzljdj@163.com",
            "work_for": "黄河水土保持绥德治理监督局（绥德水土保持科学试验站）",
            "country": "中国"
        }
    ],
    "category": "水土保持"
}