TY - Data T1 - Deepwater Platform and Control System Integrated Design Drawings A1 - xiang yan PY - 2026 DA - 2026-06-23 PB - National Cryosphere Desert Data Center AB - In response to the technical difficulties and equipment shortcomings of the lack of corresponding underwater operation equipment for repairing surface cracks in reservoir dam concrete, focusing on the key technical issue of "rapid repair and reinforcement technology and equipment for deepwater operations and discharge structures", innovative research and development are carried out based on the special water environment and boundary conditions of the reservoir dam system, breaking through the bottleneck of deepwater operation technology and equipment. DB - NCDC UR - http://www.ncdc.ac.cn/portal/metadata/88568482-f382-48a6-b99d-98de69fddf40 ER -