0931-4967592
Register
Login
中文
EN
Toggle navigation
Home
Data resource
Topics
Models and Tools
Data Submission
Emergency response
News
About
Category
Data
Glacier
399
Frozen soil
155
Desert
150
Snow
82
Hydrology
519
Polar region
35
Ecology
490
Soil and Water Conservation
699
Meteorology
687
Basic Geography
379
Remote Sensing
494
Social economy and culture
92
geochemistry
11
Atmosphere
75
Disaster
179
Debris Flow
6
Others
578
Home
Data resource
Ring knife
×
2007
×
清空全部
Collapse filters
Theme:
ASAR
(2)
Ring knife
(2)
soil moisture
(2)
CE318 solar spectrophotometer
(1)
Ground synchronous observation
(1)
Hand held infrared thermometer
(1)
Pre test
(1)
Surface radiation temperature
(1)
Wet soil moisture meter
(1)
aerosol optical thickness
(1)
atmospheric optical thickness
(1)
ground synchronous observation
(1)
pre test
(1)
soil temperature
(1)
surface roughness
(1)
Subject:
physical geography
(2)
Time:
2007
(2)
Place:
Heihe River Basin
(2)
EPU intensive observation area
(1)
Hydrological test area in upper cold region
(1)
hydrological test area of arid area in the middle reaches
(1)
intensive observation area of Linze station and intensive observation area of Linze grassland
(1)
intensive observation area of Observatory
(1)
intensive observation area of Yingke oasis
(1)
Share mode:
Apply to Access
(1)
Login to Access
(1)
default sort
visits
downloads
Publish time
update time
1/1
National Cryosphere Desert Data Center
Heihe River Integrated Remote Sensing joint test: ENVISAT ASAR ground synchronous observation data set of dense observation area in hydrological test area of arid area in the middle reaches of the pre-test period (September 19, 2007)
During the pre-test on September 19, 2007, ENVISAT ASAR satellite ground synchronous observation test was carried out at Linze station, and an ENVISAT A...
visits:
7329
file size:
1.6 GiB
update time:
2022-03-14
National Cryosphere Desert Data Center
Heihe River Integrated Remote Sensing joint test: ENVISAT ASAR ground synchronous observation data set in EBAO encrypted observation area during the pre-test period (October 17, 2007)
On the night of October 17, 2007, the ground synchronous observation test of ENVISAT ASAR data was carried out in EBU sample 1 and EBU sample 2. ENVISAT...
visits:
5766
file size:
38.1 KiB
update time:
2025-06-30