<pre><code>
This data set contains the physical and mechanical parameters of materials for tunnel excavation settlement simulation using PLAXIS3D.
The data range includes all the above physical and mechanical parameters during the shield tunneling process, which are obtained from the field survey data within 9.6 m. The dataset contains an excel file. The tabular data include material names such as fill, silty clay, completely weathered diorite, shield machine, lining and foundation, as well as their weight, cohesion, internal friction angle, elastic modulus, Poisson's ratio and thickness.
| collect time | 2018/11/01 - 2018/11/30 |
|---|---|
| collect place | Shanghai |
| data size | 27.2 KiB |
<pre><code>
Calculated by simulation.
<pre><code>
Calculated by simulation.
<pre><code>
The data quality is good.
| # | number | name | type |
| 1 | 2018YFC0809600 | National key R & D plan |
This work is licensed under
CC BY 4.0 (Creative Commons Attribution 4.0 International License).
| # | title | file size |
|---|---|---|
| 1 | 数据集说明文件.docx | 17.2 KiB |
| 2 | 盾构隧道下穿老旧建筑物群微沉降控制技术研究.xlsx | 9.9 KiB |
Metro tunnel undercrossing buildings real-time detection of grouting behind the wall automatic monitoring micro settlement
-
-
©Copyright 2005-. Northwest Institute of Eco-Environment and Resources, CAS.
Donggang West Road 320, Lanzhou, Gansu, China (730000)

