<pre><code>
This data set/database mainly includes the hidden danger data collected since the implementation of Nanning rail transit operation safety hidden danger troubleshooting and governance system and the platform launch. This data mainly counts that from October 2017 to June 2018, Nanning Rail Transit Line 1, as the pilot line for system implementation, started the trial operation of the hidden danger inspection and governance system and the trial use of the Internet based hidden danger inspection system for rail transit operation safety in June 2017, and formally implemented the system and started the set of information system in October 2017; Line 2 was officially opened in December 2017, and the information system has been officially used since January 2018. The data is obtained through the discovery and statistics of employees involved in the troubleshooting and governance of hidden dangers. The dataset contains an excel file. The tabular data includes the number of hidden dangers, collection time, collection location, hidden danger type and other information.
| collect time | 2017/10/01 - 2018/06/30 |
|---|---|
| collect place | Nanning, Guangxi |
| data size | 27.0 KiB |
<pre><code>
It is obtained through investigation.
<pre><code>
It is obtained through investigation.
<pre><code>
The data quality is good.
| # | number | name | type |
| 1 | 2018YFC0809600 | National key R & D plan |
This work is licensed under
CC BY 4.0 (Creative Commons Attribution 4.0 International License).
| # | title | file size |
|---|---|---|
| 1 | 南宁轨道交通运营安全隐患排查治理体系研究.xlsx | 9.7 KiB |
| 2 | 数据集说明文件.docx | 17.4 KiB |
Rail transit operation safety hidden danger investigation system information system
-
-
©Copyright 2005-. Northwest Institute of Eco-Environment and Resources, CAS.
Donggang West Road 320, Lanzhou, Gansu, China (730000)

